
Tower Load Analysis
FRANBAG BAU (Uganda) Limited was contracted by Airtel to analyze the capacities of 55 towers. In this analysis, FRANBAG BAU (Uganda) Limited established the total capacities of the towers and the existing loading; and hence determined the reserves the towers exhibit to carry more loading. The user shall base on the outcome of the computed available capacity to add more loading to the towers.

Project Details
Client: 55 Towers
Date: July 2014
Work: Tower Load Analysis for 55 Towers