Eskom Uganda Limited
Stabilization of the slope adjacent to the 132 kV Power Station by the use of gabions and mattresses plus provision of an adequate drainage facility for the Project Area. FRANBAG BAU (Uganda) LTD, the Consultant performed the duties and obligations of the Project Manager and was fully responsible for the supervision of the works.

Project Details
Client: Eskom Uganda Limited
Date: Nov. 2008- Oct. 2009
Work: Design and Construction Supervision of the Slope Stabilization at Nalubaale Power Station using gabions and mattresses